1. Drilling sequence (splint)
|
Last drill
|
Last drill
|
Second to last drill
|
Second to last drill
|
2. Condensing preparation
|
–
|
–
|
(Analogue to last drill)
|
Analogue to last drill
|
3. Implant insertion (maximum torque ≤ 40 N cm)
|
4. Expansion (maximum torque ≤ 40 N cm)
|
5. Evaluation of primary stability by resonance frequency analysis, primary wound closure
|
6. Postoperative digital radiogram
|
7. Re-entry after a conventional period of submerged healing (mandible 3 months, maxilla 6 months), evaluation of secondary stability by resonance frequency analysis and insertion of healing abutments
|
8. Postoperative digital radiogram
|